Our projects

Building and construction – Industrial construction

Final Engineering Study for the Toll and Weighing Stations and the Headquarters Building of the Red Vial No. 4

Services

Client: AUTOPISTA DEL NORTE S.A.C.

Location: Department of Ancash

Activity: Roads

Consulting cost: S/. 1,512,303

Period: 2010-2011

Ensuring the Management of the Concession of the Red Vial No. 4

The aim of this study is defining the works necessary for the installation of new toll and weighing stations, as well as the headquarters building, to be carried out by the Sociedad Concesionaria Autopista del Norte S.A.C. at the Red Vial No. 4.

The toll stations to be built are located at the following km points of the Red Vial No. 4:

  • Fortaleza toll: km point 220+284.
  • Huarmey toll: km point 314+000.
  • Vesique toll: km point 411+400.
  • Virú toll: km point 529+500.
  • Vesique toll: km point 402